RBSSWA are integrating an existing lead-acid battery system with 2 start-of-the-art Redflow zinc-bromine batteries on a rural property within the Shire of Gingin, north of Perth.
RBSSWA have been busy retro-fitting the battery system within an existing sea container the customer has on site. The final system will include:
- 14kw solar array
- 100kva genset
- 45kva Victron 3 phase arrangement
- 20kwh Redflow storage
- 10kwh usable lead acid battery